Purpose of this Manual
This manual is the reference guide for using costeo. It aims to:
- Explain each module of the application and how the modules connect to one another
- Provide step-by-step instructions for every documented workflow, with a screenshot of each screen
- State the field-level rules - mandatory fields, defaults, and formats - for every dialog
- Record the business rules and constraints that govern when data can still be changed
Note: CAPMO is a separate construction management platform that costeo integrates with through a connector - it is not part of costeo itself. Section 4.4 describes the integration.
What this manual covers|
Chapter |
Content |
|
1 – 3 |
Introduction, signing in, and the access model: organisation roles, permission presets, and project admin rights. |
|
4 |
Workspace administration: Projects list, Members, Companies, Connectors, Export Templates, and Permissions. |
|
5 |
The project workspace: Overview, Project settings, Cost planning, Cost tracking, Trades, Bill of quantities, Invoices, Measurement, Payment calculation, Payments, Tickets, and project-level Companies and Members. |
|
6 |
Glossary of German construction and billing terminology. |
|
Part B |
Internal handover material: environments, integrations, administration procedures, known issues, and escalation. Not for external distribution. |