Glossary
Definitions of terms used in this manual and in the application. Verify each definition against actual system behaviour before release.
|
Term |
Definition |
|
CAPMO |
Construction project management platform (Capmo GmbH, Munich) covering site-side work: tickets for tasks and defects, schedules, construction diary, documentation. Integrated with costeo through a connector. See section 4.4. |
|
Connector |
A configured integration between costeo and an external system. |
|
Z-ticket |
CAPMO ticket type (prefix Z-) carrying an invoice-relevant value such as a retention, correction, or penalty into invoice verification. See section 4.4.4. |
|
LV (Leistungsverzeichnis) |
[Service specification / bill of quantities — confirm the wording used in the application] |
|
BoQ / LV |
Bill of quantities (Leistungsverzeichnis). The structured list of services and tasks for a trade. The two terms are used interchangeably in the application. |
|
Main BoQ |
The primary bill of quantities for a trade. Required before invoicing. |
|
GAEB |
German exchange standard for construction tender and BoQ data. costeo can import and export BoQs in this format. |
|
OZ (Ordnungszahl) |
Position number identifying an item within a BoQ. |
|
Position |
An individual billable line in a BoQ, with quantity, unit, and unit price. |
|
Trade (Gewerk) |
A package of work awarded to a contractor, carrying the commercial terms applied to everything billed under it. Called a Ticket Category in earlier documentation. |
|
Contract performance security |
Retention against interim invoices (AZ), securing performance of the contract. |
|
Warranty security |
Retention applied at final invoice stage, securing the warranty period. |
|
Cash discount (Skonto) |
Discount granted for payment within a defined number of days. |
|
AZ (Abschlagszahlung) |
Progress or interim payment invoice. Numbered in its own sequence per trade, separately from the invoice number. |
|
Skonto |
Cash discount for early payment. Rate and term are set on the trade and applied on the invoice. |
|
Historical baseline |
Prior invoices for a trade issued outside costeo, captured once so that AZ numbering and previously-paid totals continue correctly. |
|
New cumulative |
Label on the invoice quantity field, indicating the cumulative quantity to date rather than the quantity for the current invoice alone. To be confirmed. |
|
Schlussrechnung |
Final invoice. |
|
Amendment |
Used in the Add trade dialog for what other screens call a supplement (Nachtrag). |
|
General deduction |
A custom percentage-based retention or fee defined on a trade. |
|
Ticket |
A defect, damage, bond, penalty, or correction raised against a trade, carrying an amount that affects the payment recommendation when approved. |
|
Ticket type |
Category of a ticket, determining how its amount is applied and under which line it appears on the payment calculation. |
|
Project-specific company |
A company record created for one project rather than shared through the organisation address book. |
|
Measurement (Aufmaß) |
Verification of invoiced quantities against quantities actually measured and accepted on site. Stage 2 of the invoice workflow. |
|
Measurement group |
A named grouping of measurement lines beneath a position, each with its own total. |
|
Calculation formula |
Arithmetic expression used to derive a measured quantity, retained for audit. |
|
Recommended (net) |
Payment amount calculated by the system on the payment calculation. |
|
Transferred (net) |
Amount actually paid by the client. Editable even after finalisation. |
|
Performance retention |
Deduction applied on a progress invoice under the contract performance security. |
|
Frozen |
State of a finalised payment calculation. |
|
GoBD |
German principles for the proper keeping and retention of books and records in electronic form. A finalised invoice is immutable in order to comply with them. |
|
Previously paid |
Cumulative amount paid to a contractor before the current invoice. |
|
Permission preset |
A reusable set of project-level permissions applied to a project member. |
|
Organisation role |
Workspace-level role: Owner, Admin, or Member. |
|
Sign-in code |
Single-use 6-character code emailed at each sign-in. costeo has no passwords. |
|
Project volume |
Target volume entered in Project settings. Note that it is separate from Contract sum and from the Cost planning budget. |
|
Contract sum |
Award plus approved supplements, as defined on the Cost tracking screen. |
|
Award |
Value of the LV positions. |
|
DIN 276 |
German standard for classifying building costs into cost groups. Used as the structure for Cost planning and Cost tracking. |
|
Supplement (Nachtrag) |
[Confirm definition and the approval flow] |
|
Manual entry |
A cost recorded directly in Cost tracking for items outside the LV, such as fees, permits, or insurance. |
|
Snapshot |
[Confirm how cost tracking snapshots are created and retained] |